    Referenz: 20140734
    Veröffentlichungsdatum: 31 März 2015

    Projektträger – zwischengeschaltetes Finanzinstitut

    MINISTRY OF INFRASTRUCTURE AND DEVELOPMENT / GDDKIA

    Ort

    Beschreibung

    Construction of the 18.5 km S2 Warsaw southern bypass expressway between Pulawska and Lubelska.

    Ziele

    The project concerns the construction of an 18.5 km long 2 x 3 expressway on a new alignment in south-east Warsaw. It forms part of the broader A2 motorway running for about 610 km, with east-west orientation, through the middle of Poland from the German to the Belorussian borders. The project will facilitate the passage of long-distance traffic around the city of Warsaw, with about 1.8 million inhabitants. The project includes a new bridge across the River Vistula, to supplement the strained capacity provided by the existing six road bridges open to the public connecting the two halves of the city.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 250 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1159 million

    Umweltaspekte

    The project involves the construction of a new expressway in a suburban and forest environment. The project falls under Annex I of Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended, requiring a full EIA procedure. The project is located in the Masovian Region and has been subject to one main procedure resulting in a positive environmental decision in April 2011. The project crosses the Natura 2000 site Dolina Srodkowej Wisly (PLB140004) and is in the vicinity of Las Natolinski (PLH140042). Therefore, the provisions of the Habitats Directive (92/43/EEC, as amended) and Birds Directive (2009/147/EC) apply. The investment is included in the National Road Construction Programme which was subject to a form of strategic environmental assessment. The procedures and outcomes of the environmental assessment are to be further reviewed during appraisal.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 17/07/2015

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).