Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20140734
Veröffentlichungsdatum: 31 März 2015

Projektträger – zwischengeschaltetes Finanzinstitut

MINISTRY OF INFRASTRUCTURE AND DEVELOPMENT / GDDKIA

Ort

Beschreibung

Construction of the 18.5 km S2 Warsaw southern bypass expressway between Pulawska and Lubelska.

Ziele

The project concerns the construction of an 18.5 km long 2 x 3 expressway on a new alignment in south-east Warsaw. It forms part of the broader A2 motorway running for about 610 km, with east-west orientation, through the middle of Poland from the German to the Belorussian borders. The project will facilitate the passage of long-distance traffic around the city of Warsaw, with about 1.8 million inhabitants. The project includes a new bridge across the River Vistula, to supplement the strained capacity provided by the existing six road bridges open to the public connecting the two halves of the city.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 250 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 1159 million

Umweltaspekte

The project involves the construction of a new expressway in a suburban and forest environment. The project falls under Annex I of Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended, requiring a full EIA procedure. The project is located in the Masovian Region and has been subject to one main procedure resulting in a positive environmental decision in April 2011. The project crosses the Natura 2000 site Dolina Srodkowej Wisly (PLB140004) and is in the vicinity of Las Natolinski (PLH140042). Therefore, the provisions of the Habitats Directive (92/43/EEC, as amended) and Birds Directive (2009/147/EC) apply. The investment is included in the National Road Construction Programme which was subject to a form of strategic environmental assessment. The procedures and outcomes of the environmental assessment are to be further reviewed during appraisal.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Unterzeichnet - 17/07/2015

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Polen Verkehr