Referenz: 20140595
Veröffentlichungsdatum: 5 Dezember 2014

Projektträger – zwischengeschaltetes Finanzinstitut

DRUZBA ZA AVTOCESTE V REPUBLIKI SLOVENIJI DD

Ort

Beschreibung

The project concerns the construction of the Draženci – Gruškovje motorway section as well as other minor investments to upgrade the motorway network.

Ziele

The project will make a significant contribution towards the completion of the Slovenian motorway network, particularly in improving the connections between Slovenia and Croatia. The project will reduce the overall transport cost on the network, producing savings in travel time and vehicle operating costs under improved road safety conditions.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 145 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 303 million

Umweltaspekte

The construction of the 13 km motorway section between Draženci and Gruškovje and the upgrading of the Šmarje - Sap junction fall under the scope of Annex 1 of the Environmental Impact Assessment (EIA) Directive 2011/92/EC and a full EIA was carried out, including public consultation. The road rehabilitation schemes and the investments in electro-mechanical equipment, intelligent transport systems and control centres do not require an EIA. Conformity with the Strategic Environmental Assessment (SEA), EIA, Habitats and Birds Directives will be checked at appraisal.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, if required.

Projektstatus

Unterzeichnet - 12/06/2015

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Slowenien Verkehr