Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20140186
Veröffentlichungsdatum: 15 Mai 2014

Projektträger – zwischengeschaltetes Finanzinstitut

LAND BRANDENBURG

Ort

Beschreibung

The projects concerns social housing retrofitting and new construction in the Land Brandenburg.

Ziele

The proposed operation is expected to comprise comprehensive retrofitting and adaption of existing social housing units and possibly some construction or reconstruction of rented social housing. The investments will need to satisfy the EIB’s eligibility criteria for urban renewal and sustainable communities. The housing investments are anticipated to form part of specific local integrated urban development plans (INSEKs/ Integrierte Stadtentwicklungskonzepte). Construction or reconstruction are expected to mostly take place on Brownfield sites.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 100 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 240 million

Umweltaspekte

Compliance with the relevant EU Directives will be verified during appraisal: EU EIA Directive 2011/92/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 79/409/EEC. The status of any environmental studies and public consultations related to the urban renewal, rehabilitation and (re-)construction investments will be reviewed during project appraisal. Energy efficiency requirements in line with the EU Directive on the Energy Performance of Buildings 2010/31/EU will also be further assessed during project appraisal.

Auftragsvergabe

The Bank will require the Borrower to ensure that contracts for the implementation of the project/sub-projects have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC/ or Directive 2004/18/EC and Directive 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Unterzeichnet - 28/10/2014

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Deutschland Stadtentwicklung