Veröffentlichungsdatum: 4 Juni 2014
Projektträger – zwischengeschaltetes Finanzinstitut
REGIE DE DISTRIBUTION ET DE PRODUCTION DE L’EAU ET DE L’ELECTRICITEOrt
Beschreibung
The Jiji and Mulembwe Hydropower Project consists of the construction of two run-of-the-river hydropower plants Jiji (31.5 MW) and Mulembwe (16.5 MW) in southern Burundi as well as an 80 km 110 kV transmission line to evacuate the power to the capital Bujumbura, which is interconnected at national and regional level. The project also includes the supply of electricity to rural communities in the vicinity of the power plants.
Ziele
The project will almost double the installed power capacity in Burundi, allowing increased access to electricity from a current level of around 4% of the population. The project will contribute to increased supply, reliability and affordability of electricity thus directly contributing to improving living standards, economic activity, growth and development.
Sektor(en)
- Energie - Energieversorgung
Under Global Europe NDICI guarantee
Under EFSD+ Guarantee
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 98 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 199 million
Umweltaspekte
The project is subject to a comprehensive ESIA, in line with the principles of EU legislation, including formal public consultation. The project is not expected to have a significant effect on any protected or environmentally-sensitive areas, including bird migration routes. Up to 221 households are expected to require resettlement, mostly as a consequence of the new transmission line. Appropriate compensation will be provided to people affected by the project in accordance with national legislation and lenders’ requirements.
Auftragsvergabe
The Bank will require the promoter to ensure that implementation of the project will be carried out in accordance with the Bank’s Guide to Procurement.
Projektstatus
Unterzeichnet - 11/12/2014
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).