Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20130274
    Veröffentlichungsdatum: 3 Juni 2015

    Projektträger – zwischengeschaltetes Finanzinstitut

    IS CALEA FERATA DIN MOLDOVA

    Ort

    Beschreibung

    The purpose of the project is to improve and modernise both Moldova's railway network and rolling stock. It consists of a framework with two components: (i) the acquisition of 11 mainline diesel locomotives suitable for both freight and passenger services and the associated maintenance equipment and (ii) the rehabilitation of selected sections of the railway infrastructure. The project is part of a broader programme, which also includes restructuring of the Moldovan railway sector in order to enable it to provide adequate services and to compete with other modes of transport.

    Ziele

    The proposed operation is in line with the objectives of the 2014-2020 External Lending Mandate as it contributes to the development of economic infrastructure, in particular transport. Being partially located on the TEN-T (Trans-European Transport Network) as extended to specific neighbouring countries based on high-level agreements on transport infrastructure, this project will play a role in deepening the integration with the European transport system. By promoting sustainable means of transport the project also contributes to climate change mitigation, a cross-cutting objective of the mandate.

    Kommentar(e)

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sektor(en)

    Garantie im Rahmen des Außenmandats

    This operation is covered by the ELM Guarantee.

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 74 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 165 million

    Umweltaspekte

    The locomotives component does not require an environmental impact assessment (EIA). The need for an EIA for the renewal of the associated maintenance depots is being analysed during the appraisal. Concerning the infrastructure rehabilitation component, the project is expected to be mainly within the existing right of way with some short sections on new alignment; therefore the potential negative environmental and social impact is likely to be minor. If situated in the EU, the project would likely fall under Annex II of Directive 2011/92/EU and therefore be subject to screening. The compliance of the procedures in place with the EIB's environmental and social standards will be analysed during the appraisal.

    Auftragsvergabe

    The promoter is a public entity. The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 26/09/2016

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Republik Moldau Verkehr