    Referenz: 20130184
    Veröffentlichungsdatum: 1 Juli 2015

    Projektträger – zwischengeschaltetes Finanzinstitut

    PJSC UKRHYDROENERGO

    Ort

    Beschreibung

    Construction of a hydropower pumped storage plant in Central Ukraine with an installed capacity of 1,000 MW.

    Ziele

    The project will have multiple benefits, including substituting for energy currently generated inefficiently by intermittent operation of oil and gas-fired thermal power plants, thereby producing significant savings in fuel, carbon emissions and maintenance costs. The project will also improve the security of supply by providing 1 000 MWe of dispatchable reserve capacity as well as additional frequency and voltage control capability. This will help Ukraine stabilise its power system, contribute to security of supply in Ukraine and thus facilitate possible future interconnection of the Ukrainian system with the ENTSO-E Continental European power system.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 400 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1282 million

    Umweltaspekte

    If located within the EU, the project would be classified as an Annex I project under Directive 2011/92/EU, requiring a full environmental impact assessment (EIA). EIA and public consultation procedures have been carried out in accordance with national legislation and received approval from the competent authority in March 2013. The EIA procedures and environmental management plan will be reviewed during appraisal in order to ensure that the project complies with the Bank's requirements.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be carried out in accordance with the Bank's Guide to Procurement.

    Projektstatus

    In Prüfung - 19/06/2013

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Ukraine Energie