Veröffentlichungsdatum: 6 Mai 2014
Projektträger – zwischengeschaltetes Finanzinstitut
The Kingdom of Spain, through its Ministry of Public Works and Transport ("Fomento").Ort
Beschreibung
The project concerns the implementation of an interoperable dual gauge railway line along the Spanish Mediterranean coast from Castellbisbal (Barcelona) to Almussafes (Valencia), and the construction of a connection with the high-speed line Madrid-Barcelona-French border.
Ziele
The project aims at ensuring railway interoperability for rail traffic between the French border and Algeciras in southern Spain along the Spanish Mediterranean coast.
Kommentar(e)
Sektor(en)
- Verkehr - Verkehr und Lagerei
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 1050 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 1400 million
Umweltaspekte
The project is expected to decrease the negative impacts associated with road traffic and have positive impacts on the environment thanks to the modal transfer to rail.
Auftragsvergabe
The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/18/EC/ or 2004/17/EC and Directive 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.
Projektstatus
Unterzeichnet - 21/11/2014
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).