Suche starten De menü ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20130068
    Veröffentlichungsdatum: 6 Mai 2014

    Projektträger – zwischengeschaltetes Finanzinstitut

    The Kingdom of Spain, through its Ministry of Public Works and Transport ("Fomento").

    Ort

    Beschreibung

    The project concerns the implementation of an interoperable dual gauge railway line along the Spanish Mediterranean coast from Castellbisbal (Barcelona) to Almussafes (Valencia), and the construction of a connection with the high-speed line Madrid-Barcelona-French border.

    Ziele

    The project aims at ensuring railway interoperability for rail traffic between the French border and Algeciras in southern Spain along the Spanish Mediterranean coast.

    Kommentar(e)

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 1050 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1400 million

    Umweltaspekte

    The project is expected to decrease the negative impacts associated with road traffic and have positive impacts on the environment thanks to the modal transfer to rail.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/18/EC/ or 2004/17/EC and Directive 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Projektstatus

    Unterzeichnet - 21/11/2014

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Tags

    Spanien Verkehr