Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20130046
    Veröffentlichungsdatum: 26 April 2013

    Projektträger – zwischengeschaltetes Finanzinstitut

    The City of Bialystok

    Ort

    Beschreibung

    The project is part of the framework loan approved and signed with the City of Bialystok ( FL 20100230 ). It includes construction and rehabilitation of road schemes aiming at improving traffic flow and safety

    Ziele

    The project will enhance the city's transport network, contributing to alleviate its growing traffic and reduce congestion, pollution, and traffic-related accidents. The project is located in an area designated as Convergence Region under the Community Support Framework and is therefore eligible for Bank financing under Article 309, point (a) "projects for developing less-developed regions" and (c) "projects of common interest" (sustainable urban transport), of the EC Treaty.

    Kommentar(e)

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    PLN 115 million (EUR 27 million)

    Gesamtkosten (voraussichtlicher Betrag)

    PLN 438 million (EUR 104 million)

    Umweltaspekte

    According to the information provided by the promoter about the five schemes included in the project, all of them fall under Annex II of the scope of the EIA Directive 2011/92/EU and have been screened in by competent authority having already the correspondent Environmental Decisions (EIS). In principle, there are not NATURA 2000 areas in the vicinity of the project.

    Auftragsvergabe

    The Bank will check/require that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/17/EC/ or 2004/18/EC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Projektstatus

    Genehmigt - 4/10/2013

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Verkehr