    Referenz: 20110275
    Veröffentlichungsdatum: 17 Januar 2012

    Projektträger – zwischengeschaltetes Finanzinstitut

    ADMINISTRACION NACIONAL DE ELECTRICIDAD

    Ort

    Beschreibung

    The project concerns the construction of a 500kV high voltage transmission line between Villa Hayes and Yacyretá with an approximate length of 300km.

    Ziele

    The purpose of the project is to reinforce and upgrade the power transfer capability of Paraguay’s transmission network and its interconnection with neighboring countries. The project will help meet the growing electricity demand by supplying electricity from a renewable energy source, thus supporting the EU priority target of climate change mitigation.

    Kommentar(e)

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 75 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 223 million

    Umweltaspekte

    The guidelines of the international finance institutions involved and the national legislation require for this project an environmental and social assessment (ESIA). A consultant is currently preparing the first phase of this assessment defining line sections where resettlement would be needed. The ESIA process and its results will be reviewed, as well as the promoter’s capacity to implement and monitor the required impact mitigation measures in line with the Bank’s guidelines.

    Auftragsvergabe

    The procurement of the section to be financed by the Bank will be carried out in line with the requirements of the Bank’s Guide to Procurement.The rest of the contracts are expected be tendered internationally, in line with the rules of the IADB .The project’s procurement policy and strategy will be appraised.

    Projektstatus

    Unterzeichnet - 11/12/2013

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Paraguay Energie