Veröffentlichungsdatum: 8 September 2011
Projektträger – zwischengeschaltetes Finanzinstitut
Roads Department of Georgia
12 Kazbegi avenue, 0160 Tbilisi, Georgia
info@georoad.ge
Ort
Beschreibung
Construction of new road and upgrading of existing road.
Ziele
The project aims at upgrading and improving the most Western part of the East-West highway, from Zestaponi to Batumi-South 10 km before the Turkish Border at Sarpi, for a total length of about 185 km.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 200 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 600 million
Umweltaspekte
If located within the EU, the project would fall under Annex I of the EIA Directive 85/337/EEC as amended and would require a full EIA, including the necessary issues relating to the Habitats and Birds Directive. As part of the EIA a scoping and screening of the motorway component of the project has been performed incorporating amongst others, biodeversity analyisis, analyses of alternatives and intensive public meetings/consultations. At design stage the balance of the EIA will be performed on the chosen alternative, including preparation of the environmental mitigation plan as well as land acquisition and resetlement plan. During this phase a second round of public consultations will be held.
Auftragsvergabe
The legal documentation will oblige the promoter to ensure that any procurement procedures on the sections financed by the Bank are done in accordance with EIB Guidelines and the relevant applicable EU rules.
Projektstatus
Unterzeichnet - 11/05/2012
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).