490.000.000 €
Länder
Sektor(en)
Griechenland : 490.000.000 €
Energie : 490.000.000 €
Unterzeichnungsdatum
17/12/2025 : 50.000.000 €
26/01/2026 : 202.000.000 €
23/12/2025 : 238.000.000 €

Übersicht

Veröffentlichungsdatum
7 Juli 2025
Projektstatus
Referenz
Unterzeichnet | 17/12/2025
20250178
Projekttitel
Projektträger – Finanzintermediär
IPTO NORTH EAST AEGEAN INTERCONNECTION
INDEPENDENT POWER TRANSMISSION OPERATOR SA
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 490 million
EUR 1628 million
Ort
Sektor(en)
Beschreibung
Ziele

The project will connect the island regions of Lemnos, Lesvos, Chios, Samos and Skyros to the mainland transmission grid through Nea Santa in Thrace to the north and Aliveri on Evia to the east. It will also link them to the Dodecanese islands grid via Mastichari on Kos to the south. The connection will primarily use 150 kV alternating current (AC) cable interconnectors and 150 kV gas-insulated substations (GIS).

The project supports the energy and climate policy objectives of the European Union and Greece. It will end the electrical isolation of the islands concerned and provide a more efficient, reliable and cleaner electricity supply compared with the current reliance on local diesel or heavy fuel oil power stations. It will also improve security of supply, increase capacity for connecting renewable energy sources in the region and foster economic development on the islands, particularly through tourism.

Additionality and Impact

The Project will interconnect the North-East Aegean Islands, which currently rely on polluting oil-based generation, to the Hellenic Electricity Transmission System. It will enable the development and integration of additional renewable capacity (onshore and offshore), delivering significant economic benefits through local and general impacts by addressing multiple market failures. The Project also supports regional development and cohesion.

The net benefits of the Project translate into a good economic profitability and broader social benefits. The good governance framework underpins overall good quality and results of the Project.

The Project is consistent with national and EU climate and energy goals and aligns with the REPowerEU objectives. The financing of this Project also contributes to the Bank's lending priority objectives on Climate Action, Environmental Sustainability, and Economic and Social Cohesion. The financing of the Project will contribute to the Bank's Energy Lending Policy themes on Securing the Enabling Infrastructure (energy networks).

The proposed operation meets the required funding needs of the Promoter, by providing an amortising loan with a long tenor and an adequate pre-amortisation period, together with a sizeable financing volume. The EIB loan is expected to further improve the Promoter's maturity profile as well as the diversification of its funding sources.

Umweltaspekte
Auftragsvergabe

Most of the project components fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. The impacts that can be typically expected relate to visual impact, vegetation clearance, collision and electrocution of flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora (Habitats 92/43/EC and Birds 2009/147/EC Directives)

The EIB will require the promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
In Prüfung
Genehmigt
Unterzeichnet
12 Dezember 2025
17 Dezember 2025

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Dokumente

Formblatt ökologische und soziale Aspekte - IPTO NORTH EAST AEGEAN INTERCONNECTION
Datum der Veröffentlichung
17 Dec 2025
Sprache
Bereich
Finanzierung
Nummer des Dokuments
248837342
Thema
Umweltinformationen
Projektnummer
20250178
Sektor(en)
Länder
Öffentlich zugänglich
Jetzt herunterladen

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen