Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    42.119.773,32 €
    Länder
    Sektor(en)
    Laos : 42.119.773,32 €
    Energie : 42.119.773,32 €
    Unterzeichnungsdatum
    26/04/2005 : 42.119.773,32 €
    Link zum projekt
    Andere Links

    Übersicht

    Veröffentlichungsdatum
    26 November 2004
    Projektstatus
    Referenz
    Signed | 26/04/2005
    20020596
    Projekttitel
    Projektträger – Finanzintermediär
    Nam Theun 2 Hydroelectric Project
    Lao People’s Democratic Republic
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    EUR 40 million.
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project concerns the development, construction and operation of a hydroelectric plant on the Nam Theun River in Laos, mainly intended for the export of power to Thailand. It will be carried out on a Build-Own-Operate-Transfer basis, under a 25-year concession, by a consortium of experienced companies.

    The project is a major undertaking for the Lao PDR and can improve considerably the economic outlook of the country.

    Financing of the supply of technology and equipment.

    As to its economic objectives, the project offers the opportunity to produce a significant amount of cost-efficient renewable energy in the region. Most of it would meet increasing electricity demand in Thailand, for which the project would also contribute to the stability of the electricity supply system.

    For Laos, the project represents currently the best single-largest option to contribute to sustainable social and economic development, and the first real prospect to reduce the country's dependence on Official Development Assistance. (The other main option is export of tropical timber, but this option has been rejected as being unsustainable over the long run and severely environmentally degrading).

    The project is expected to generate substantial revenues for Laos: it will be by far the largest single contributor to GDP and to the GoL's fiscal revenues, and the largest single source of foreign exchange. Appropriate mechanisms are being designed by the Government of Laos and the project financiers to ensure that the revenues of the project help to reduce poverty, sustain development, and improve the environment.

    In the project area, the project is expected to allow a significant improvement of living standards for the impacted population.

    Umweltaspekte
    Auftragsvergabe

    The potential environmental, social and economic impacts of the project have been subject to a series of thorough assessments and evaluations, including public participation, in line with the requirements of the concession agreement and with World Bank policies. The project provides for important measures to mitigate or compensate its social and environmental impacts.

    The Bank is conducting its due diligence to ensure that the final EIA and the proposed mitigating measures apply appropriate technologies and comply with EU environmental and social policies as well as national requirements.

    Also, it will ensure that the project is in line with the Bank's policies on sustainable development and, in particular, climate change. In that regard, the project offers the opportunity to supply large amounts of renewable power on a continuous basis (not requiring subsidies) for export to the growing and energy-needing economy of Thailand. It would thereby avoid thermal generation and the associated emissions of greenhouse gasses and other air pollutants in Thailand.

    In the project area, the project is expected to support the long-term protection of the watershed and its 4,000 km2 primary forest.

    Negociated procedure, with some sub-contracts internationally tendered.

    Link zum projekt
    Andere Links

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Aktuelles und Storys

    Link zum projekt

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen