Référence: 20240042
Date de publication: 16 juillet 2024

Promoteur – Intermédiaire Financier

BRATISLAVSKA VODARENSKA SPOLOCNOST AS

Lieu

Description

The investment programme 2024-2026 will finance the rehabilitation, upgrade, modernisation and extension of the water and wastewater management infrastructure in the catchment area of the Bratislava water company. Additionally, the project will support investments related to renewable energy (biogas) generation.

Additionality and Impact

The project covers various investments relating to the development and modernisation of the water and wastewater infrastructure within the municipality of Bratislava and the surrounding region. The project is in line with EU and EIB policy objectives of environmental protection and climate action, and will generate positive externalities in the form of environmental and health benefits. These benefits would not be realised to the same extent without public intervention. EIB provides significant financial contribution by offering longer maturity and flexible customised terms compared to the conditions currently available on the market. EIB financing will help the Borrower to strengthen its funding sources. Thus, EIB's involvement will have an impact on mobilising other financiers and signalling that the project is sound and worth supporting, thereby facilitating the full financing and implementation of the project.

Objectifs

The aim is to enhance the quality, security and climate change resilience of Bratislava's water supply, wastewater collection and treatment system, also in view to comply with the national and EU legislation.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

EUR 80 million

Coût total (montant approximatif)

EUR 168 million

Aspects environnementaux

The project will ensure continued compliance with key EU directives in the water sector, notably the Directive Drinking Water Directive (2020/2184/EU), the Urban Waste Water Treatment Directive (91/271/EEC) and the Water Framework Directive (2000/60/EC). Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU), Strategic environmental assessment (SEA) Directive 2001/42/EC, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be respected.

Passation des marchés

The promoter has to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 19/12/2024

Milestone
À l'examen
Approuvé
Signé
30 août 2024
19 décembre 2024

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Slovaquie Eau, assainissement