Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20220953
    Date de publication: 4 juillet 2023

    Promoteur – Intermédiaire Financier

    STADT NUERNBERG

    Lieu

    Description

    The project concerns an intermediated loan to finance the construction of a highly energy efficient school building for 1,700 students in Nuremberg, Germany. The project is implemented by WBG Kommunal GmbH, a public housing construction company of the City of Nuremberg.

    Additionality and Impact

    The proposed operation supports the construction of a highly energy efficient school building in the City of Nuremberg, Germany. The project therefore addresses a market failure with regard to the provision of public education for which the operator cannot capture sufficient financial benefits, justifying public intervention.


    Part of the financial advantage generated by the Financial Intermediary through the EIB's intervention is transferred to the final beneficiary, for example in the form of reduced interest rate payable, increasing the availability of budget for other means. 

    Objectifs

    The project addresses a need for additional school places in the City of Nuremberg.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 81 million

    Coût total (montant approximatif)

    EUR 169 million

    Aspects environnementaux

    Directive 2011/92/EU amended by 2014/52/EU on Environmental Impact Assessment (EIA) does not specifically cover educational activities, leaving it at the discretion of the responsible competent authorities to request an EIA on the basis of the location and scale of the works concerned. However, educational facilities may fall under Annex II of the Directive with respect to Urban Development. The Bank's services will verify during appraisal whether an EIA is required by the competent authority. The public buildings will be required to at least meet the energy efficiency targets as defined in Directive 2010/31/EU on the energy performance of buildings and Directive 2012/27/EU on energy efficiency.

    Passation des marchés

    In accordance with the Bank's policy to ensure that the loan complies with the EU acquis, in particular in the fields of public procurement, the Bank will require such intermediary institution to take all requisite measures to ensure that the procurement procedures carried out by the final beneficiary for the project that the Bank finances will comply with the relevant EU legislation and the applicable national legislation, provided that it is in conformity with EU rules.

    Statut

    Signé - 19/12/2023

    Milestone
    À l'examen
    Approuvé
    Signé
    1 août 2023
    19 décembre 2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Éducation