    Référence: 20210301
    Date de publication: 17 février 2023

    Promoteur – Intermédiaire Financier

    MOTOR OIL (HELLAS) CORINTH REFINERIES SA

    Lieu

    Description

    The project concerns the deployment of an Electric Vehicle Charging (EVC) network and the development of Hydrogen infrastructure for transport. The EVC network will include fast charging type. The Hydrogen transport infrastructure includes an electrolyser for hydrogen production, as well as filling terminal to load the trailers, hydrogen trailers and Hydrogen Refuelling Stations (HRS).

    Additionality and Impact

    The project concerns the deployment of alternative fuel infrastructure for zero emission vehicles (ZEV). The project contributes to the EIB's objective of sustainable transport, decarbonisation, development of TEN-T infrastructure thereby supporting EU policy objectives. The project is fully aligned with the European Commission sustainable transport and low-emission mobility policies.


    The ZEV market including electric and hydrogen vehicles is at a very early stage of development in Greece with significant operational performance uncertainty and high upfront costs.

    The ZEV market is subject to network effect and depends upon the size and availability of the associated public EV charging and Hydrogen Refueling stations network, which is at a very early stage in Greece.


    This project contributes to the deployment of alternative fuels, thereby contributing to reducing the negative environmental externalities of road transport, in the form of the reduction of CO2, air pollutants (Nitrogen Oxides, Particulate Matter), also aiming to reduce the fuel consumption costs for transport operators, mostly Small and Medium Enterprises, and consumers.


    The EIB would provide an adequate financing to the borrower, allowing it to further diversify its financing sources. The Bank's tailor-made product would provide the company with a longer maturity than the ones available on the market and more aligned with the expected lifetime of the project, as well as more favourable terms under various other dimensions (such as longer availability and grace period).


    The EIB's contribution to this investment is expected to materially contribute to the Promoter's effort to meet its ESG targets and crowd-in Green Finance investors. The EIB's financing would also provide a signalling effect on the soundness and quality of the project, facilitating funding from commercial banks.


    Finally, the EIB decision to finance the project is key for the promoter's application to the CEF Alternative Fuel Infrastructure Facility ("AFIF") grant.

    Objectifs

    The main objective of the project is to accelerate the transition to a zero-emission electric and hydrogen-powered mobility in Greece by rolling out the associated electric charging and hydrogen refuelling infrastructure.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 40 million

    Coût total (montant approximatif)

    EUR 84 million

    Aspects environnementaux

    A more specific analysis of environmental aspects in relation to the deployment of the infrastructures of production, refuelling and storage of hydrogen, will reviewed during appraisal, including Environmental Impact Assessment (EIA) aspects. The project will also be reviewed for Paris alignment in accordance with the policies set out in the EIB's Climate Bank Roadmap. By rolling out a zero-emission vehicles charging and hydrogen refuelling stations infrastructure, the project is expected to generate environmental economic benefits in terms of reduced air pollution (Nitrogen Oxides, Particulate Matter), reduced greenhouse gas emissions and lower noise.

    Passation des marchés

    The promoter has been assessed by EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation (i.e. Directive 2014/24/EC), then the Bank would require the promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation Directive 2014/24/EC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 22/12/2022

    Milestone
    À l'examen
    Approuvé
    Signé
    10 octobre 2022
    22 décembre 2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Grèce Transports