Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20210142
    Date de publication: 19 juillet 2021

    Promoteur – Intermédiaire Financier

    FRANFINANCE SA

    Lieu

    Description

    Framework loan dedicated to Lease Financing of Private Finance for Energy Efficiency (PF4EE) eligible investments with an attached PF4EE guarantee under operation 20210141.

    Objectifs

    The operation, a framework loan to Société Générale acting as Borrower (with Franfinance S.A. acting as Financial Intermediary and Promoter) under the Private Finance for Energy Efficiency (PF4EE) programme, will support the installation of energy-efficient equipment and renewable energy generation capacity on business premises. The operation supports investments leading to energy savings, renewable energy generation and enabling infrastructure for electric vehicles, thus helping to achieve national and European targets for energy efficiency, renewable energy and low-emissions transport. It will deliver CO2 emission reductions, while also contributing to the security and diversification of energy supply in the EU. In addition, a significant share of the investment will be in cohesion regions, thus supporting their development.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 38 million

    Coût total (montant approximatif)

    EUR 50 million

    Aspects environnementaux

    The project is aligned with EU and French national policy and regulation regarding environmental sustainability and more specifically with the Energy Efficiency Directive (2012/27/EU and as amended 2018/2002/EU), the Energy Performance of Buildings Directive (2010/31/EU and as amended 2018/844/EU), and the Renewable Energy Directive (2009/28/EC and as recast 2018/2001/EU). The Promoter will be required to adhere to any other environmental regulation affecting the operation such the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU.

    Passation des marchés

    The operation will target corporate clients in France as the final beneficiaries. Much of the procurement will take place under private sector conditions, however some public procurement may occur for public entity clients who will follow French and EU public procurement rules. Under these conditions, the procurement procedures to be followed by the Promoter are suitable for the project and satisfactory to the EIB.

    Statut

    Signé - 29/12/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    France Énergie