    Référence: 20170824
    Date de publication: 10 octobre 2019

    Promoteur – Intermédiaire Financier

    REPUBLICA DEMOCRATICA DE SAO TOME E PRINCIPE

    Lieu

    Description

    The project consists of the reconstruction, upgrading and coastal protection of the Sao Tome City's main avenue, Avenida Marginal 12 de Julho. The project aims to improve the road safety and connectivity, being the key part of the primary national road network and core element of the capital's urban regeneration and tourism development.

    Objectifs

    The project aims to improve safety for pedestrians, motorised as well as non-motorised vehicles on the road and the hinterland, its connectivity as transport and coastal protection corridor and ultimately its climate resilience. The project will also include Technical Assistance for project preparation and implementation. In detail, the project will: i) improve the connection between the capital and the country's main airport; ii) improve the mobility conditions within the capital area; iii) contribute to the improvement of the overall road network by enhancing the link between the national roads EN1, EN2 and EN3; iv) increase the protection of the coastal stretch along the road against erosion and flooding; v) increase the attractiveness of the capital's waterfront for both locals and tourism development; and vi) improve accessibility to the coast and the conditions of fishery landing sites.

    Commentaires

    The project is in full support of investments in transport infrastructure (SDG 9), Climate Action (SDG 13) and sustainable and resilient cities (SDG 11), by reducing road users' cost and increasing transport and urban infrastructure resilience, a pre-condition for poverty reduction (SDG 1) and achieving sustainable economic growth (SDG 8). It will also directly contribute to the implementation of Sao Tome's "Nationally Determined Contributions (NDC)", agreed under the COP 21 'Paris Agreement, which prioritises climate adaptation measures.

    Secteur(s)

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Montant BEI envisagé (montant approximatif)

    EUR 15 million

    Coût total (montant approximatif)

    EUR 28 million

    Aspects environnementaux

    The proposed investments will focus on essential road rehabilitation and coastal protection with direct positive impact in people's livelihoods and the Sao Tome island's environment. The project was subject to a preliminary Environmental and Social Impact Assessment (ESIA), which will be complemented during project preparation with additional studies as needed. An Environmental Permit has been issued for the project. An environmental and social management plan (ESMP) will be part of the project preparation. Details will be assessed during appraisal.

    Passation des marchés

    It is required that the promoter ensures that implementation of the project will be done in accordance with the EIB's Guide to Procurement.

    Statut

    Signé - 19/12/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Sao Tomé-et-Principe Régional - Afrique centrale Transports