Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170663
    Date de publication: 14 décembre 2017

    Lieu

    Description

    Stage I: Upgrading of railway line and installation of European Train Control System (ETCS) level 2 on the Kelenföld-Százhalombatta section

    Objectifs

    The project will increase the quality of rail services provided in Hungary as well as promote travel by rail, thereby enhancing sustainable transport in line with EU objectives. The economic benefits expected are time savings for existing passengers, vehicle operating cost reduction and accident reduction for travellers expected to shift from road to rail as a result of the project. The project offers furthermore some environmental benefits from modal shift of passengers.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 101 million

    Coût total (montant approximatif)

    EUR 240 million

    Aspects environnementaux

    An environmental impact assessment (EIA) was carried out as required by the EIA Directive for projects covered by Annex I. Following the EIA procedures, including public consultation, the competent authority issued an environmental permit which identifies mitigation measures for environmental impact during the construction period as well as during operation. The project is located close to a Natura 2000 site, the Danube River. The competent authority, however, declared in the environment permit that the project does not have significant impact on the Natura 2000 site.

    Passation des marchés

    The Bank will require the promoter to ensure tendering of contracts for the implementation of the project, in accordance with the relevant applicable EU procurement legislation, in particular Directive 2014/24/EU, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Approuvé - 16/03/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Hongrie Transports