Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170024
    Date de publication: 4 mai 2018

    Promoteur – Intermédiaire Financier

    MINSKVODOKANAL UE

    Lieu

    Description

    The project consists of the reconstruction of Minsk's largest wastewater treatment plant.

    Objectifs

    The investment loan will finance the complete reconstruction of Minsk's central wastewater treatment plant with the objective of increasing treatment capacity and improving the quality of treated effluent. In particular, the investment is expected to help to meet current and envisaged future capacity requirements in Minsk, to reduce environmental pollution, increase energy efficiency and to ensure compliance with current effluent discharge standards.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 84 million

    Coût total (montant approximatif)

    EUR 187 million

    Aspects environnementaux

    The project will generally benefit the environment and public health, by providing better and more efficient waste water treatment before discharging effluents into receiving waters bodies and eventually into the Black Sea. The main objective of the project is the compliance with effluent and water quality standards as set by the EU directives and partially transposed into national law. Compliance with national Environmental Impact Assessment (EIA) legislation that has been drafted by partially transposing the EU's EIA Directive will be verified during the appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 20/11/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Biélorussie Eau, assainissement