Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150865
    Date de publication: 6 juin 2017

    Promoteur – Intermédiaire Financier

    MINISTERIO DE SALUD

    Lieu

    Description

    The overall objective of this operation is to support the Panama Sanitation project in the Panama Oeste Province, located west of Panama City and Canal. The project will consist of the construction of a wastewater collection system - sewerage networks, pumping stations and household connections - the construction of a conveyance system and a wastewater treatment plant to provide full sanitation services to the sector of La Chorrera and other surrounding areas. The project is a successor operation to the West Panama City Sanitation Programme - Burunga. The rest of the project will be financed by the Inter-American Development Bank (IADB), the Latin American Development Bank (CAF), the Spanish Cooperation Agency (AECID), the Central American Bank for Economic Integration (CABEI) and the government of Panama.

    Objectifs

    The programme contributes to the government's efforts to reduce pollution and improve environmental sustainability. It will benefit an estimated population of about 225,000 at completion. The treatment facility will be designed to avoid the discharge of over 115,000 cubic meters per day of untreated wastewater into the environment. It will also indirectly have a positive economic impact due to its proximity to the metropolitan area of Panama. The project is in line with the EIB Water Sector Lending Policy and is eligible for financing under the EIB Climate Action and Environment Facility (CAEF) as it contributes to environmental sustainability through pollution abatement, to underpin sustainable growth in the region.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    USD 50 million (EUR 43 million)

    Coût total (montant approximatif)

    USD 584 million (EUR 497 million)

    Aspects environnementaux

    The project will have a very high positive environmental and social impact for the population of Panama. It will significantly reduce direct wastewater discharges into water bodies, thus contributing to improving public health and environmental conditions in the beneficiary area. The project's compliance with environmental and social principles of the EU, the EIB and the other IFIs, together with the applicable national environmental legislation and issues related to adaptation to climate change, will be verified during the appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that the procurement of the project is carried out in line with the EIB Guide to Procurement.

    Statut

    Signé - 27/06/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Panama Eau, assainissement