Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150811
    Date de publication: 8 avril 2016

    Promoteur – Intermédiaire Financier

    ZELJEZNICKA INFRASTRUKTURA CRNE GORE AD

    Lieu

    Description

    Rehabilitation of railway infrastructure along the main north-south trunk line crossing Montenegro (extended core TEN-T, Orient/East Med Corridor)

    Objectifs

    The project contributes to the development of economic infrastructure, in particular transport. It is located on the core Trans-European Transport Network (TEN-T), Orient/East Med Corridor, as extended to specific neighbouring countries based on high-level agreements on transport infrastructure. The projects lies on a section pre-identified as a priority under the EU-sponsored 2015 Connectivity Agenda and is expected to benefit from a EUR 20m investment grant. The project is eligible for the Bank's financing under Article 309 (c) and under the EIB's external lending mandate.

    Commentaires

    Apart from the domestic traffic, the project is expected to contribute to the traffic between Montenegro and Serbia and, via Serbia, other Western Balkan countries and the EU. By facilitating rail transport, the project will contribute to the competitiveness of the country's economy. The project will increase the quality, availability and reliability of rail services in Montenegro, and is expected to generate time and vehicle operating and maintenance costs savings, reduce infrastructure maintenance costs and improve railway safety. It may also contribute to the modal shift from road to rail and, thereby, present environmental and road safety benefits.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 40 million

    Coût total (montant approximatif)

    EUR 45 million

    Aspects environnementaux

    The project is expected to be mainly within the existing right of way; therefore potential negative environmental and social impacts are likely to be minor. If situated in the EU, the project would likely fall within Annex II of the Environmental Impact Assessment (EIA) Directive and therefore be subject to screening. The potential impact on any conservation areas will also need to be appraised. Compliance of the procedures in place with EIB environmental and social standards will be analysed during the appraisal.

    Passation des marchés

    If situated in the EU, the promoter would be subject to public procurement legislation. The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 20/03/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Monténégro Transports