Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20130397
Date de publication: 27 septembre 2013

Promoteur – Intermédiaire Financier

TRANSPORT SCOTLAND

Lieu

Description

The AWPR/B-T project involves the construction of about 58km of new dual carriageway. The project is almost exclusively greenfield. It includes the construction of 12 new intersections, extensive drainage, earthworks and pavement works, as well as the construction of over 150 structures (including two significant river crossings). The project will also accommodate a number of intelligent transport system elements.

Objectifs

AWPR/B-T aims at (i) relieving congestion and (ii) improving safety in the road networks in and around Aberdeen.

Commentaires

Secteur(s)

Montant BEI envisagé (montant approximatif)

GBP 271 million (EUR 326 million)

Coût total (montant approximatif)

GBP 800 million (EUR 960 million)

Aspects environnementaux

All the major components of the AWPR/B-T project (the AWPR (Northern Leg, Southern Leg, Fastlink) and Balmedie-Tipperty are classes of development that fall under Annex I of the EIA Directive (Directive 2011/92/EU). EIAs have been undertaken and following a screening assessment on potential adverse impacts on habitat sites, Appropriate Assessments were performed in accordance with the Habitats (92/43/EEC) and Birds Directives (2009/147/EC). Environmental decisions in favour of the projects have been issued by the competent authorities.

Passation des marchés

The project is to be procured using the Scottish Governments Non-Profit Distributing model. The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation with publication of tender notices in the EU Official Journal, as and where required.

Statut

Signé - 12/12/2014

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Royaume-Uni Transports