Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20110273
    Date de publication: 2 septembre 2011

    Promoteur – Intermédiaire Financier

    Ministry of Transport of the Czech Republic;
    Managing Authority of the Operational Programme of Transport in the Czech Republic

    Lieu

    Description

    The project concerns the first phase of the reconstruction of the Přerov Railway Node located in the Olomouc Region, forming part of TEN-T Priority Project no. 23, Railway Axis Gdansk-Warsaw-Brno/Bratislava-Vienna. The project includes, among other, the reconstruction of 8.8 km of double track lines including all associated works within the boundaries of the Přerov railway node. Line speed will be increased up to 160 km/h in the station vicinity and 80 km/h along the passenger platforms.

    Objectifs

    The main objective of the first project phase is to recondition Přerov railway station according to technical and operational parameters determined for the modernisation of the selected railway networks in the Czech Republic, improving capacity and reliability of the existing infrastructure for passengers and freight traffic.

    Commentaires

    Under Framework Loan

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to CZK 677 million (EUR 28 million)

    Coût total (montant approximatif)

    CZK 4.225 million (EUR 171 million)

    Aspects environnementaux

    The EIA process was executed for the full reconstruction of the Přerov railway node, not just this first phase seeking EIB finance in accordance with the applicable legislation, notably the Habitats Directive 92/43/EEC and the EIA Directive 97/117/EC as amended, transposed in the Czech Republic into Act 100/2001 Coll. on the Environmental Impact Assessment. The competent authority assessed that the project did not require an EIA and issued the EIA negative screening decision in June 2005.

    Potential adverse identified effects will occur mainly during the construction phase, including air & light pollution, noise & vibration. These and other impacts have been assessed as minor and temporary. Mitigation measures have been defined.

    Passation des marchés

    EU procurement directives (2004/17/EC, 2004/18/EC) have been transposed into Czech legislation by the Act No. 137/2006 Coll.

    The contract notices for the international open tender were published in the Official Journal of the European Communities (OJEC).

    Statut

    À l'examen - 2/09/2011

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Tchéquie Transports