Date de publication: 20 février 2008
Promoteur – Intermédiaire Financier
Ministry of Transport and Communication of the Federation of Bosnia and Herzegovina
Lieu
Description
The project concerns the construction of two motorway sections on Corridor Vc :
- Vlakovo - Tarcin, South of Sarajevo, in a length of 19 km
- Svilaj - Odzak, in a length of 9 km, at the Northern border with Croatia, including a bridge across the Sava river, the border between BiH and Croatia
Objectifs
The project will significantly increase accessibility and reduce travel times, thereby contributing to a balanced economic development of the regions concerned. Current average speeds on existing road are estimated at some 50 km/h and these should rise to 120 km/h with the new infrastructure. Commuting among main cities and towns along the corridor will be much faster and more comfortable.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 166 million
Coût total (montant approximatif)
About EUR 340 million
Aspects environnementaux
This type of project (construction of a motorway) falls under Annex I of EU Directive 85/337/EEC as amended by Directive 97/11/EC and thus requires a full EIA.
Passation des marchés
The Bank will require the promoter to ensure that implementation of the project will be done in compliance with the Bank’s Guide to Procurement and applicable EU rules.
Statut
Signé - 22/08/2012
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).