Date de publication: 22 octobre 2004
Promoteur – Intermédiaire Financier
Syndicat Mixte des Transports en Commun de l’Agglomération Grenobloise (SMTC Grenoble).Lieu
Description
The project consists of the construction of two new lines (C and C’) for Grenoble's tramway network along with the supply of the rolling stock and additional equipment required for their commissioning. The double-track line serving 22 new stations will be 11.7 km long and feature a new depot and various improvements to the urban environment.
Objectifs
The project is the core component of the Urban Transport Plan adopted by SMTC Grenoble in May 2000, the objectives of which are to:
- enhance the quality of urban life,
- revitalise the region's economy,
- improve links between districts while respecting sensitive areas,
- encourage a switch from car use in the city to less polluting modes of transport.
Commentaires
Urban transport.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 200m
Coût total (montant approximatif)
EUR 422.2m
Aspects environnementaux
Overall, the project will have a positive environmental impact.
Passation des marchés
The project falls under European procurement directive 93/38/EC as amended by directive 98/4/EC. The promoter complies fully with the provisions of this directive.
Statut
Signé - 2/06/2005
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).