Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20010535
    Date de publication: 29 juin 2002

    Promoteur – Intermédiaire Financier

    Kärntner Restmüllverwertungs GmbH.

    Lieu

    Description

    The project concerns the construction of an incineration plant for the non-hazardous waste in Austria's southern Federal State Carinthia (Land Kärnten). The relatively small classical waste incineration plant is designed to service the Federal State's entire residual waste volume with an 80.000 t/a throughput capacity, generating electricity, optionally district heat and industrial process steam. Project implementation commenced in 2001 and completion is currently planned for 2004.

    Objectifs

    A study on concepts for waste treatment launched in 1994 by the Carinthian Government identified thermal waste incineration as the most ecologically and economically effective and efficient method to process residual waste. In 1996 the Government of the Federal State endorsed the conclusion, leading to a thermal treatment of all local residual waste at a central facility in Carinthia.The project is expected to comply with new national environmental protection legislation and EU objectives to avoid land filling of non-recyclable municipal waste. In addition, the project should enable the efficient recovery of energy from the combustion of waste by producing steam and electricity. This would contribute to reducing the consumption of primary energy for heat and power generation, and thereby to a reduction in related pollutants and CO2 emissions.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    About EUR 40 million.

    Coût total (montant approximatif)

    About EUR 80 million.

    Aspects environnementaux

    Planning consent procedures comprised fully-fledged EIA with public hearings which has been upheld in court procedures. Project is located in industrial area formerly used for mining and smelting lead and zinc. The project's compliance with all applicable national and EU environmental legislation will be verified during appraisal.

    Passation des marchés

    To be assessed during appraisal.

    Statut

    Signé - 10/12/2003

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Autriche Énergie Déchets solides