Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

Signature(s)

Montant
400 000 000 €
Pays
Secteur(s)
Allemagne : 400 000 000 €
Eau, assainissement : 400 000 000 €
Date(s) de signature
18/12/2023 : 400 000 000 €
Lien vers la source

Fiche récapitulative

Date de publication
28 juin 2023
Statut
Référence
Signé | 18/12/2023
20230079
Nom du projet
Promoteur – Intermédiaire financier
BERLIN WATER AND CLIMATE ADAPTATION PROGRAMME
BERLINER WASSERBETRIEBE AOER
Montant BEI envisagé (montant approximatif)
Coût total (montant approximatif)
EUR 400 million
EUR 978 million
Lieu
Secteur(s)
  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
Description
Objectifs

The project is part of the 2023 to 2027 investment programme of Berliner Wasserbetriebe (BWB), the public water company for Berlin and surrounding communities. The investments mainly consist of the extension and rehabilitation of water supply and wastewater collection and treatment facilities.

The aim is to contribute to mitigate market failures in the water sector by financing infrastructure that make a positive impact on the environment, public health and climate, not fully reflected in the current water and wastewater tariffs in the serviced area. More specifically, the project aims to: (i) adapt to climate change to ensure sufficient quantity and quality of water supply to BWB's customers (ii) increase the removal of nutrients and micro-pollutants from the wastewater effluent to improve the quality of the receiving surface water body (iii) meet the demands for water supply and wastewater disposal in the service area, thereby enhancing the quality of life of local population. The investments are also expected to increase the generation of renewable energy and improve water and energy efficiency.

Additionality and Impact

The project concerns the 2023-2027 investment programme in water supply and wastewater collection and treatment of Berliner Wasserbetriebe (BWB), Germany's largest water utility. The service area of BWB covers the State of Berlin and localities in the neighbouring State of Brandenburg, and has a total population of around 4.4 million inhabitants. The investment programme mainly consists of the extension, upgrading and rehabilitation of water supply and wastewater collection and treatment facilities. The project aims to: (i) adapt to climate change to ensure sufficient quantity and quality of water supply to BWB's customers, (ii) increase the removal of nutrients and micro-pollutants from the wastewater effluent to improve the quality of the receiving surface water body and (iii) meet the demands for water supply and wastewater disposal in the service area, thereby enhancing the quality of life of the population in the service area. The investments are also expected to increase the generation of renewable energy and improve water and energy efficiency. The project will contribute to mitigating market failures in the water sector by financing infrastructure that generates positive environmental, public health and climate externalities that are not fully reflected in the applicable water and wastewater tariffs in the service area.

 

The Bank's loans have been a cornerstone of the borrower's substantial long-term investment programme into its water and wastewater systems, providing a substantial contribution to the programme's financeability and affordability. The loan will offer key benefits such as a very long loan maturity and flexibility with respect to drawdowns, interest rate arrangements and grace periods, which will enable the required alignment with the implementation and financial modalities of the project.


Aspects environnementaux
Passation des marchés

By contributing to sustainable water and wastewater management, the programme will make an overall positive environmental impact, in line with BWB's 2002 sustainability strategy to further contribute to a more sustainable and climate resilient Berlin. The project supports compliance with the EU Water Framework Directive (2000/60/EC), Drinking Water Directive (2020/2184/EU 98/83/EC), the Urban Wastewater Directive (91/271/EEC) and EU and national environmental legislation. It will contribute to climate action and environmental sustainability (CA&ES) objectives, in particular, among others, to climate mitigation and adaptation, sustainable use and protection of water resources and pollution prevention and control, by increasing water and energy efficiency, reducing storm water overflows emissions and improving wastewater treatment. Some investments may entail limited environmental and social impacts, therefore these may fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU), requiring the competent authorities to determine whether an EIA is required. Where a formal EIA is required, a copy of the Environmental & Social Impact Study or the Non-Technical Summary (NTS) or equivalent document will be provided to the EIB, and published on its website. BWB will be required to verify that all of the schemes submitted for EIB financing are in line with the Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC. Should any part of the project bring a negative impact on a nature conservation site, BWB will have to inform EIB about the mitigating measures required to comply with the Habitats and Birds Directives.

The promoter has to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant EU procurement legislation, 2014/25/EU, where applicable, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union, as and where required.

Commentaires

This will be the sixth operation of BWB financed by the EIB since 1994.

Milestone
À l'examen
Approuvé
Signé
24 octobre 2023
18 décembre 2023
Lien vers la source

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Documents

Fiche technique sur les aspects sociaux et environnementaux - BERLIN WATER AND CLIMATE ADAPTATION PROGRAMME
Date de publication
9 Mar 2024
Langue
Sujet général
Prêts
Numéro du document
175334193
Thématique du document
Information Environnementale
Numéro du projet
20230079
Secteur(s)
Pays
Disponible au public
Télécharger maintenant

Informations et observations générales

La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

Informations aux médias

Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

Mécanisme de traitement des plaintes

Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

Tolérance zéro face à la fraude et à la corruption

La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

Publications connexes