Referenz: 20250207
Veröffentlichungsdatum: 19 November 2025

Projektträger – zwischengeschaltetes Finanzinstitut

REACTIVE TECHNOLOGIES LTD

Ort

Beschreibung

The project involves developing and deploying advanced technology across Europe to enable real-time measurement of power system inertia, system strength and oscillation monitoring.

Ziele

The targeted technology will address the challenges to grid stability caused by the growing integration of non-synchronous, inverter-based renewable energy sources. In particular, real-time, high-accuracy inertia measurements will support network operators in optimising the curtailment of renewable energy sources and the procurement of reserve services. This will ultimately help reduce energy costs for end users and lower carbon monoxide emissions.

Kommentar(e)

Renewable Energy Sources (RES) unlike traditional power generators do not supply inertia. Decreasing inertia exposes the system to more regular, larger and faster frequency deviations when events on the network occur. These events increase the risk of generation and load disconnections and islanding. As mitigations, operators curtail RES and procure more reserve services. While necessary, these actions are expensive and, when used excessively or unnecessarily, can slow the progress toward a greener energy system.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 19 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 40 million

Umweltaspekte

The inertia measurement may include the installation of MW scale Ultracapacitor or Battery Energy Storage Systems that will be requested to comply with applicable national and EU legislation, as appropriate.

Auftragsvergabe

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions.

Projektstatus

In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Luxemburg Finnland Energie