Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

Übersicht

Veröffentlichungsdatum
8 September 2025
Projektstatus
Referenz
In Prüfung | 18/07/2025
20250232
Projekttitel
Projektträger – Finanzintermediär
IREN CLIMATE ACTION & CIRCULAR ECONOMY LOAN II
IREN SPA
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 225 million
EUR 420 million
Ort
Sektor(en)
  • Energie - Energieversorgung
  • Müllbeseitigung - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen
Beschreibung
Ziele

The operation supports the Promoter's 2024-2028 investment plan in circular economy and energy efficiency sectors. The project entails investments in municipal waste collection infrastructure, including containers, vehicles, and recycling civic centres. It also supports the transition from a street-based waste collection model to a door-to-door system, alongside the implementation of technologies to ensure traceability of waste collection and increase the rate of waste segregation at source. Additionally, the project includes targeted investments in energy efficiency measures that will contribute to reducing the energy consumption of buildings.

The aim is to support investments that promote the transition to a circular economy and enhance energy efficiency in Italy. The project is aligned with the sector priorities of both the EU and the EIB's in waste management and energy, as well as with the EIB’s Climate Action and Environmental Sustainability (CA&ES) lending objective, particularly climate mitigation and circular economy. Additionally, the project meets the Paris Alignment criteria and supports the EU Circular Economy Action Plan and the European Green Deal. By improving source segregation and efficient collection of waste, the project will contribute to meet the EU and country targets for diversion of waste from landfills and materials recycling in line with the requirements in the Landfill Directive 1999/31/EC and Waste Framework Directive 2008/98/EC, as amended. The energy efficiency measures comply with the Energy Efficiency Directive, applying the "energy efficiency first" principle, and with the Energy Performance of Buildings Directive. By targeting key market failures, the Project helps address unaccounted positive externalities, such as the environmental benefits of source segregation of waste, underinvestment in recycling and circular economy initiatives, energy savings, reductions in carbon emissions, and improvements in air quality. It also contributes to long-term financing solutions to overcome the challenges of high upfront costs and extended payback periods. The project complies with Article 309 point (c) of common interest.

Umweltaspekte
Auftragsvergabe

Investments in waste management will increase the recovery of materials, thereby decreasing the volume of waste sent to incineration or landfill. This supports compliance with key EU directives in the waste management sector, notably the Waste Framework Directive (2008/98/EC, amended by Directive (EU) 2018/851), the Landfill Directive (1999/31/EC), and the Packaging and Packaging Waste Regulation (Regulation (EU) 2025/40). The waste management components are not expected to fall under the environmental impact assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU as they primarily involve the purchase of assets and improvements to the collection model, something that will be verified during appraisal. The energy efficiency components will contribute to reduce the energy consumption of buildings and are aligned with the objectives of the Energy Performance of Buildings Directive (2010/31/EU as amended by EU/2024/1275). The energy efficiency schemes are not expected to fall under the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, provided that the buildings will be integrated in urban areas. Where and if applicable, and based on a risk-based approach as defined in the EIB Group's Environmental and Social Policy, the requirements of the EIA 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be checked during appraisal. Any potential adverse environmental or social effects, such as noise pollution, are expected to be minor and will be mitigated through appropriate site and works management. Overall, the operation is expected to contribute to EIB's CA&ES objectives, with a focus on climate change mitigation through energy efficiency and promotion of the circular economy.

The Promoter shall ensure that contracts for implementation of the Project have been or will be tendered in accordance with the applicable EU procurement legislation, Directives 2014/23/EU (Concession Contracts), 2014/24/EU (Public Procurement), 2014/25/EU (Procurement in Utilities Sectors), where applicable, as well as Directive 92/13/EEC (Remedies in the Utilities Sector) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. Information about selection of suppliers/contractors is not known to the EIB.

Milestone
In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Allgemeine Fragen und Anmerkungen

Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

Medienanfragen

Medienanfragen können Sie an die Pressestelle der EIB. Bitte besuchen Sie auch unseren Pressebereich.

Beschwerdeverfahren

Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht das Beschwerdeverfahren der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

„Null Toleranz“ gegenüber Betrug und Korruption

Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und der Betrugsbekämpfungspolitik behandelt.

Weitere Veröffentlichungen