Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20250274
Veröffentlichungsdatum: 29 August 2025

Projektträger – zwischengeschaltetes Finanzinstitut

VIVERACQUA SCARL

Ort

Beschreibung

The project will support small to medium water utilities through innovative structured financing in the Italian region of Veneto.

Additionality and Impact

The Project supports investments in the drinking water supply and wastewater infrastructure by various utilities providing Integrated Water Services (IWS) in the Veneto region in Italy. It will ensure compliance with key European regulations in the water sector, along with National regulations, and will improve the coverage and quality of water supply and sanitation services in the Veneto region. The Project contributes to the Bank's policy objectives of Sustainable Energy and Natural Resources as well as Climate Action and Environmental Sustainability.


The Project addresses a number of market failures through positive externalities in the form of environmental and public health benefits, notably improved quality of recipient waters and reduced greenhouse gas emissions from wastewater infrastructure. These benefits are not completely reflected in water tariffs and would not be realised to the same extent without public intervention.


Furthermore, the Project addresses a chronic investment gap in water services in Italy and provides long-term finance at attractive terms compared to commercial banking funding, through an innovative product (securitisation of a mini-bonds), fostering the creation of a an alternative way to access traditional EIB financing. EIB's participation as an anchor investor positively impacts the utilities' stability and diversification of their source of financing.

Ziele

The project concerns the modernisation and upgrade of water collection, treatment and supply infrastructures. Proposed project components related to water supply include the extension and rehabilitation of water supply networks and other related works with the application of best available technologies. Related to sanitation and wastewater, the project will concern investments to extend and rehabilitate sewer systems and wastewater treatment plants (WWTPs), among others. Additional project components might include the installation of remote-control systems with the goal to increase efficiency during the operation and maintenance of existing and future assets and networks.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 200 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 466 million

Umweltaspekte

Some of the project components might be subject to a mandatory Environmental Impact Assessment (EIA) report, including public consultations. The decision of the competent Authorities regarding their Environmental Impact Assessment will be assessed during appraisal. The project components are likely to fall under Annex II of the EIA Directive (2011/92/EU) amended by the Directive 2014/52/EU, Strategic Environmental Assessment Directive (2001/42/EC), Habitats Directive (92/43/EEC), Water Framework Directive (2000/60/EC), Urban Wastewater Treatment Directive (91/271/EEC), Drinking Water Directive (2020/2184/EU) and Birds Directive (2009/147/EC). It is expected that the projects will generate significant environmental and public health benefits from reduced discharge of untreated wastewater to environmental bodies because of rehabilitated and upgraded sewer systems and WWTPs. Investments in water supply networks and distribution systems will result in reduced water losses, a more rational use of scarce water resources and the protection of local groundwater. The full environmental details will be further examined during appraisal.

Auftragsvergabe

The Bank will require the Utility Companies to ensure that contracts for the implementation of the project will be tendered in accordance with the applicable EU procurement legislation Directives 2014/23/EU, 2014/24/EU or 2014/25/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. Information on awarded main suppliers/contractors for the implementation of the envisaged operation is not available.

Projektstatus

Unterzeichnet - 4/12/2025

Milestone
In Prüfung
Genehmigt
Unterzeichnet
18 November 2025
4 Dezember 2025

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Italien Wasser, Abwasser