Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20250128
Veröffentlichungsdatum: 1 Dezember 2025

Projektträger – zwischengeschaltetes Finanzinstitut

MUNICIPALITY OF PLOIESTI

Ort

Beschreibung

The project includes investments in the renewal of the tram fleet through the acquisition of 20 new low-floor trams, as well as minor refurbishment of the existing tram depot to ensure improved stabling facilities.

Ziele

The project includes investments in the renewal of the tram fleet through the acquisition of 20 new low-floor trams, as well as minor works to the existing tram depot to ensure improved stabling facilities. The project forms part of a broader investment programme led by the Municipality of Ploiesti to modernise the public transport offer, as outlined in the city's Sustainable Urban Mobility Plan (SUMP) and Integrated Urban Development Strategy (SIDU). The EIB loan will contribute to improving the quality, reliability, and environmental performance of tram operations, while enhancing the operational efficiency, safety, and accessibility of the public transport offer in Ploiesti, located in a less developed region of the EU and a territory of the Just Transition Mechanism.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 36 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 51 million

Umweltaspekte

Where and, if applicable, and based on a risk-based approach, as defined in the EIB Group's Environmental & Social (E&S) Policy, the requirements of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be checked during appraisal.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with EU procurement legislation, 2014/25/EU or 2014/24/EU where applicable as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

In Prüfung - 1/09/2025

Milestone
In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Rumänien Verkehr