Suche starten DE menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20240624
Veröffentlichungsdatum: 19 November 2024

Projektträger – zwischengeschaltetes Finanzinstitut

CITY OF ZAGREB

Ort

Beschreibung

The project concerns the revitalisation of the existing brownfield location in the centre of Zagreb to create a new multifunctional public building.

Additionality and Impact

The Project is a major allocation (Large Scheme) under the Zagreb Sustainable Urban Infrastructure Framework Loan (FL), supporting the the investment programme of the City of Zagreb. The Project consists in the revitalisation of the brownfield area in the city centre and creation of a new multifunctional public library as the capital's cultural centre.


The Project is expected to contribute to Climate Action and Environmental Sustainability (CAES) through energy efficiency and adaptation measures. It will also contribute to the economic and social cohesion, as it will be implemented in Grad Zagreb NUTS II region, which is considered as less developed region for the 2021-2027 Programming Period.


The operation is expected to be eligible under Article 309 point (a) projects for less developed regions and point (c) common interest.


In terms of addressing market failures, the Project will generate positive externalities through an improved provision of cultural and educational facilities, amenities and services, as well as improvement of the quality of life of residents.


Finally, the EIB would be providing financial added value, through its competitive and long-term financing terms aligned with the economic life of the Project assets and a flexible disbursement schedule. The EIB loan is helping to bridge the financing gap necessary for the implementation of the Project through co-financing the Integrated Territorial Investment (ITI) Programme co-financed by ESIF.


Ziele

The aim is to create a new public library as a cultural centre.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 30 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 95 million

Umweltaspekte

The project falls under Annex II of the Environmental Impact Assessment (EIA) Directive. An EIA screening was done in 2023 and the Project was screened out. Furthermore, given the urban nature of the project, there are no Natura 2000 or other protected areas nearby.

Auftragsvergabe

The Promoter has to ensure that contracts for the implementation have been tendered in accordance with the applicable EU procurement legislation (2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Genehmigt - 18/12/2024

Milestone
Genehmigt
18 Dezember 2024

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Kroatien Stadtentwicklung