Suche starten De menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20240619
Veröffentlichungsdatum: 12 Mai 2025

Projektträger – zwischengeschaltetes Finanzinstitut

BAYERISCHE EISENBAHNGESELLSCHAFT MIT BESCHRAENKTER HAFTUNG,FREISTAAT BAYERN

Ort

Beschreibung

The project will finance the acquisition of bimodal rolling stock (electric, battery powered) with tilting technology to operate on two regional passenger rail transport networks in the Southwest and Northeast of Bavaria (Neigetechnik Allgaeu "NTA" and Expressverkehr Nordostbayern "EVNO") under public service contracts.

Ziele

The aim is to increase the supply and quality of the passenger transport services as well as promote travel by rail, thus reducing the use of road transport and the associated negative impacts on the local environment, road safety and greenhouse gas emissions. In line with the EU objectives, the project promotes sustainable transport.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

not disclosed

Gesamtkosten (voraussichtlicher Betrag)

not disclosed

Umweltaspekte

The project consists of the acquisition of new rolling stock. Acquisition of rolling stock is out of the scope of the Environmental Impact Assessment (EIA) Directive (2011/92/EU as amended by 2014/52/EU), the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC). By promoting the modal shift from road to rail, the project will generate environmental benefits

Auftragsvergabe

The Promoter has to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU, as well as Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

In Prüfung - 20/02/2025

Milestone
In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Deutschland Verkehr