Veröffentlichungsdatum: 2 Mai 2024
Projektträger – zwischengeschaltetes Finanzinstitut
NAVARRA DE INFRAESTRUCTURAS LOCALES SAOrt
Beschreibung
The project will finance wastewater treatment schemes under NILSA's 2023-2030 investment plan.
Ziele
The aim is to comply with the requirements of Navarra's Water Master Plan and to meet a full circular economy and zero carbon footprint target. The related investments will focus on three lines of action: i) centralized sludge treatment in Tudela and Arazuri wastewater treatment plants ii) upgrade and rehabilitation of existing wastewater treatment plants iii) wastewater treatment facilities in small agglomerations.
Sektor(en)
- Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 50 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 135 million
Umweltaspekte
The investment is geared toward upgrading wastewater treatment infrastructure bringing positive environmental impacts. The promoter will be required to comply with the EU Water Framework Directive (2000/60/EC), Urban Waste Water Treatment Directive (91/271/EEC), and EU and national environmental legislation (notably under environmental impact assessment (EIA) Directive 2011/92/EU (as amended by the Directive 2014/52/EU), Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC). This investment is expected to preserve the quality of water resources and to promote a clean and circular economy through the reutilisation of wastewater sludge in agriculture. It will, therefore, increase the quality of life in the project area. Social negative impacts are only temporary (e.g. safety hazards during construction, traffic, noise) and will be addressed as part of the planning for the implementation of each scheme. The promoter has demonstrated sound practices with respect to environmental, health and safety management and will be required to ensure compliance with the applicable legislation regarding social matters. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate mitigation, pollution prevention and control, sustainable use and protection of water and marine resources. Where and if applicable, the requirements of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC and the requirements of social standards will be verified during appraisal.
Auftragsvergabe
The promoter has to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/23/EU and/or 2014/24/EU and/or2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.
Projektstatus
In Prüfung
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).