Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20240138
    Veröffentlichungsdatum: 18 Juni 2024

    Projektträger – zwischengeschaltetes Finanzinstitut

    PKP INTERCITY

    Ort

    Beschreibung

    The project will finance new electric and bi-mode locomotives, bi-mode multiple units and passenger coaches, as well as coaches modernisation. The rolling stock will be used to provide long distance services predominantly under a Public Service Contract throughout Poland and to limited extent also in neighbouring countries.

    Ziele

    The aim is to increase the quality of rail services provided in the country and promote rail travel to reduce the use of private vehicles. The project will therefore benefit the local environment by reducing greenhouse gas emissions and improve road safety. The project contributes to sustainable transport in line with EU objectives and being largely located in a convergence area and by facilitating access, it also promotes regional development.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    PLN 2625 million (EUR 602 million)

    Gesamtkosten (voraussichtlicher Betrag)

    PLN 5250 million (EUR 1204 million)

    Umweltaspekte

    The investments proposed under the Project do not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU as manufacturing and use of rail rolling stock is not included in either list. The need for an EIA and/or assessment according to the Habitats Directive for associated facilities (e.g. maintenance workshops or depots) will be analysed during the appraisal. All else equal, the Project is expected to have a positive environmental impact by helping the railways to maintain modal share in key sections of the passenger market that are most appropriately met by rail. In addition, the arrangements for the scrapping of the replaced stock will be checked during appraisal.

    Auftragsvergabe

    The promoter to ensure that contracts for the implementation of the Project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    In Prüfung - 24/04/2024

    Milestone
    In Prüfung

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Verkehr