Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20230843
    Veröffentlichungsdatum: 29 Februar 2024

    Projektträger – zwischengeschaltetes Finanzinstitut

    HELSINGIN SEUDUN YMPAERISTOEPALVELUT - KUNTAYHTYMAE

    Ort

    Beschreibung

    The project co-finances part of the 4-year (2024-2027) investment programme in water and wastewater services of the Helsinki Region Environmental Services (HSY) authority in the Helsinki metropolitan area. The programme mainly concerns the extension of supply network, the replacement of aging water distribution and sewer mains and upgrading of water production and wastewater treatment facilities.

    Ziele

    The aim is to upgrade drinking water supply and wastewater treatment as well as the distribution networks in the promoter's service area. The investment is geared toward securing a sustainable management of water supply and wastewater treatment.

    Sektor(en)

    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 350 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 706 million

    Umweltaspekte

    The project will bring positive environmental and resource efficiency impacts through the upgrade of the water distribution mains, production infrastructure and other network as well as processes optimisation. Additionally, it enhances water supply infrastructure resilience and addresses climate adaptation and mitigation. Compliance with the EU Water Framework Directive (2000/60/EC), Drinking Water Directive (98/83/EC), Urban Wastewater Treatment Directive and EU and national environmental legislation will be verified during appraisal.

    Auftragsvergabe

    HSY has to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU (OJEU), as and where required.

    Projektstatus

    Genehmigt - 3/06/2024

    Milestone
    In Prüfung
    Genehmigt
    3 Juni 2024

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Finnland Wasser, Abwasser