Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20210639
    Veröffentlichungsdatum: 9 Januar 2023

    Projektträger – zwischengeschaltetes Finanzinstitut

    STATE BANK OF INDIA

    Ort

    Beschreibung

    The operation consists of a framework loan to support climate action investments in India. The facility will finance renewable energy generation projects, electric mobility or green hydrogen production, as well as potentially other eligible climate action investments.

    Ziele

    The framework loan will finance a series of renewable energy generation plants located in India, mostly of small to medium size, as well as potentially other climate action investments, such as renewable energy equipment manufacturing or low carbon transport, promoted by private sector companies.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 200 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 400 million

    Umweltaspekte

    If the schemes were located within the EU, most of them would fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2014/52/EU amending the EIA Directive 2011/92/EU), with the competent authorities assessing the need for an EIA. The inclusion of certain interconnection infrastructure, falling under Annex I, would require a mandatory EIA. In India, environmental and social regulations include some of the elements present in the EU Directives, although there is traditionally certain lack of enforcement. In particular, national regulation requires an Environmental and Social Standards Assessment (ESIA) for these type of projects. Compliance with ESIA at the Framework Loan and allocation levels will be verified during the appraisal of the schemes, in particular the Promoters' environmental and social capabilities and procedures, public consultation process, vulnerable groups and land tenure issues.

    Auftragsvergabe

    The Promoter has to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 31/12/2022

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Indien Energie