Suche starten De menü ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20210199
    Veröffentlichungsdatum: 21 Juli 2021

    Projektträger – zwischengeschaltetes Finanzinstitut

    DIAKHITEL KOZPONT ZRT

    Ort

    Beschreibung

    The project consists of financing student loans for students in higher education institutions, post-secondary vocational education, training programmes and adult learning programmes in Hungary.

    Ziele

    The overall aim of the project is to enable more people to access to higher levels of education and gain qualifications, knowledge and skills that would enhance the economic and social wellbeing of Hungary. The project will contribute to increasing access to higher, vocational education and training and adult education for individuals who otherwise would not have the financial means. This project is therefore likely to generate positive effects, both at individual and societal levels.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 150 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 317 million

    Umweltaspekte

    The project does not comprise any capital investment infrastructure. In light of this and its immaterial nature, the project does not fall under any of the annexes of the Directive 2014/52/EU amending Directive 2011/92/EU and therefore does not need an environmental impact assessment (EIA).

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU, where applicable, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Genehmigt - 23/09/2021

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Tags

    Ungarn Bildung