Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20210112
    Veröffentlichungsdatum: 19 Juli 2023

    Projektträger – zwischengeschaltetes Finanzinstitut

    UKRAINE

    Ort

    Beschreibung

    The project consists of a framework loan (FL) to improve drinking water supply and waste water treatment in cities throughout Ukraine, focusing in particular to the quick restoration and repair of damaged or overstretched water and sanitation infrastructure. Despite ongoing war and difficulties, the economic and social life in many parts of Ukraine continues and the Government must ensure that at least basic needs of the population are met.

    Ziele

    The aim is to ensure the safe and sustainable provision of critical services to the local population, including the large number of internally displaced persons (IDPs), predominantly women, children and elderly persons. The project will support municipalities under control of the Ukrainian Government that are hosting significant influxes of IDPs and that are sufficiently safe to benefit from the technical assistance. Eligible investments under the Ukraine Water Recovery FL would include: diagnostic equipment (water main inspection and leak detection systems), laboratory equipment, equipment for operation maintenance of networks, pumping stations and plants, special vehicles for water/wastewater services, reconstruction, rehabilitation, upgrade, extension, replacement, supply or new construction of water source infrastructure, water supply and distribution systems, water/wastewater treatment facilities, sludge processing facilities, water and sewerage house connection, including introduction metering and District Metering Areas (DMA), bulk water metering, Supervisory Control and Data Acquisition (SCADA) system and hydraulic modelling, water and energy efficiency measures, technical designs, supervision.

    Kommentar(e)

    Guarantee to be determined.

    Sektor(en)

    • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 200 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 200 million

    Umweltaspekte

    The large majority of the foreseen investments concern repairs and refurbishment of damaged water infrastructure and are to be performed within existing facilities or rights of way. Some of these schemes might be subject to Environmental Impact Assessment (EIA) under the National EIA Law, which transpose the requirements of the EIA Directive 2011/92/EC as amended by Directive 2014/52/EU and ensures compliance with Ukraine's international obligations under the Association Agreement between EU and Ukraine. Also, the relevant analysis of social risks and impacts of sub-projects will be duly carried out as part of the appraisal, in accordance with the EIB Social Standards. The project will contribute to climate action and environmental sustainability objectives, in particular to climate mitigation, climate adaptation, pollution prevention and control, sustainable use and protection of water and marine resources, protection and restoration of biodiversity & ecosystems.

    Auftragsvergabe

    The promoter has to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement and the relevant applicable EU public procurement rules.

    Projektstatus

    Genehmigt - 15/11/2023

    Milestone
    In Prüfung
    Genehmigt
    15 November 2023

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Ukraine Wasser, Abwasser