Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20200706
    Veröffentlichungsdatum: 20 Oktober 2022

    Projektträger – zwischengeschaltetes Finanzinstitut

    OEBB-PERSONENVERKEHR AG

    Ort

    Beschreibung

    The scope of the project entails the purchase of electric trains to be used for regional passenger railway services in the eastern regions of Austria. The promoter is OEBB-Personenverkehr AG. The EIB will finance the new rolling stock, in total about 41 "DINO" double-deck trainsets.

    Additionality and Impact

    The Bank's loan will finance the acquisition of new train rolling stock by ÖBB PV for regional passenger rail services in the "Ostregion" (Eastern regions of Austria).

    The project supports a shift to more sustainable transport. It represents good value and has an excellent environmental and social impact by delivering the new trains needed to continue and expand the operation of the most important part of public transport in the "Ostregion". in the shape of its regional train network. The Bank's support for the project will also help realise the cost savings and further benefits over the asset life time generated by the promoter's leading involvement. The new trains will help offer accessible, reliable, affordable and high quality public transport, connecting citizens with employment opportunities, social and educational infrastructure and the wider transportation network. 


    The Bank's loan provides an important contribution to the funding of the borrower's ambitious top-climate action-rated capex programme for a modern train fleet. Thus, it supports the diversification and stability of the borrower's funding base. The very long maturity is of distinct value, matching the 30 years' economic life span of the underlying rolling stock assets rather than the much shorter validity of the borrower's current existing Public Service Contracts for regional public transport.




    Ziele

    The project consists of the acquisition of new rolling stock (expected to be 41 double-deck electric multiple units (EMUs)) and associated equipment to operate the project fleet's rail passenger services on the Austrian railway network. The trains are expected to have operational capability on Austrian, German, Czech, Slovakian and Hungarian networks as part of cross-border traffic. The project fleet will replace existing aging rolling stock assets and unlock the capacity to deliver to future service requirements. The new trains are scoped to be compliant with all relevant Technical Specifications for Interoperability, offer more comfort, improved energy efficiency and lowered carbon emission. The new fleet is part of a programme of sector-wide works including new infrastructure (electrification and signalling) and rolling stock for Austrian railways in the east of the country.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 200 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 829 million

    Umweltaspekte

    The investment proposed under the project does not fall under either Annex I or Annex II of the Environmental Impact Assessment Directive 2011/92/EU as manufacturing of rail rolling stock is not included in either list. The need of EIA and/or assessment according to the Habitats Directive for associated facilities (e.g. maintenance workshops, depots or infrastructure) and the arrangements for the scrapping of the replaced rolling stock will be analysed during the appraisal. The project is expected to have a positive environmental impact by helping the railways to maintain or even enlarge modal share in key sections of the passenger market that are most appropriately met by rail.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 20/06/2023

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    21 Dezember 2022
    20 Juni 2023

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Österreich Verkehr