Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20200254
    Veröffentlichungsdatum: 19 Oktober 2020

    Projektträger – zwischengeschaltetes Finanzinstitut

    MUNICIPIUL BUCURESTI - SECTORUL 6

    Ort

    Beschreibung

    Financing of the fourth phase of the Bucharest S6 thermal rehabilitation programme to improve the energy efficiency of 277 individual buildings (corresponding to 85 homeowner associations) located in Sector 6 of Bucharest Municipality. This project falls under the Smart Finance for Smart Buildings (SFSB) Initiative, a joint initiative of the EIB Group and the European Commission (EC) aimed at supporting energy efficiency investments in buildings.

    Ziele

    The project will improve the energy efficiency of 85 homeowners associations located in Bucharest Sector 6. The project targets 277 buildings and will focus on thermal energy efficiency improvements of the building envelope (wall, roofs and cellar insulation), window replacement, improvements in the heating and domestic hot water systems and replacement of indoor lighting located in common spaces.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 20 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 95 million

    Umweltaspekte

    This operation is expected to produce environmental benefits by supporting measures which reduce energy consumption and help mitigate climate change. The buildings to be rehabilitated are expected to have limited negative environmental impact during construction. Given the scale, location and nature of the sub-projects, an environmental impact assessment (EIA), as defined under the EIA Directive 2014/52/EU amending the 2011/92/EU, is normally not required. The operation will comply with the requirements of the Energy Performance of Buildings Directive 2010/31/EU.

    Auftragsvergabe

    The Promoter is a public entity and therefore public procurement rules will apply. The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable national and EU procurement legislation (Directive 2014/24/EU and Directive 2007/66/EC), which may include publication in the Official Journal of the EU where appropriate.

    Projektstatus

    Unterzeichnet - 13/04/2021

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Rumänien Stadtentwicklung