    Referenz: 20200250
    Veröffentlichungsdatum: 14 Januar 2021

    Projektträger – zwischengeschaltetes Finanzinstitut

    KYIV CITY

    Ort

    Beschreibung

    Project consists of investment in new trolleybuses and metro coaches.

    Ziele

    The investments financed under the operation will improve the quality and sustainability of public transport service in Kyiv and will have a positive effect on the local economy. The investment is expected to deliver socio-economic benefits and savings in terms of travel time, vehicle operating costs and road accident costs, as well as have a positive impact on the environment (decrease in local air/noise emissions and greenhouse gas emissions) as a result of the expected shift of passengers from private cars to sustainable public transport modes.

    Kommentar(e)

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 100 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 217 million

    Umweltaspekte

    The purchase of new trolleybuses and metro coaches does not fall within the scope of either Annex I or Annex II of the EIA Directive 2011/92/EU as amended by Directive 2014/52/EU. Therefore, if the project were situated in the EU, no environmental impact assessment (EIA) would be required. The EIB will assess the arrangements for the scrapping of dismissed rolling stock in Ukraine and the storage of hazardous waste material. Overall, compliance with the Bank's Environmental and Social Standards will be assessed during appraisal.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Projektstatus

    In Prüfung - 24/09/2020