    Referenz: 20200095
    Veröffentlichungsdatum: 15 April 2020

    Projektträger – zwischengeschaltetes Finanzinstitut

    ACCEPTABLE CORPORATE(S),PUBLIC ENTITY(IES)

    Ort

    Beschreibung

    The project consists of a Programme Loan to support both public and private promoters responsible for roll out of electric vehicles charging infrastructure (EVCs) in Italy. The Programme Loan will also include the deployment of road electric vehicle fleet that are under public service contracts with the exception of Public Transport. The operation will contribute to accelerate the electrification of the road transport sector and make it cleaner.

    Ziele

    The project will contribute to accelerate the electrification of road transport, contributing to EU goals outlined in the 2011 Transport White Paper (EC, 2011) and the Strategy for Low-Emission Mobility (EC, 2016). Finally, part of the investment is expected to take place in cohesion regions. The project will contribute to Sustainable Transport, Climate Action and the Bank's Transport lending policy.

    Kommentar(e)

    n/a

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 200 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 400 million

    Umweltaspekte

    The sub-projects will involve short connections to the distribution grid and the respective charging stations. The environmental impact during construction and operation of the sub-projects will be further assessed at the time of their allocation under the programme loan. EV infrastructure in itself is not subject to environmental impact assessment processes under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive. However, the construction of green field parking locations where the EV infrastructure is installed and/or the connections to the grid may be screened in under Annex II. The Bank will require in those cases to be informed of the screening decisions and the procedures followed by the Promoters to ensure compliance with the requirements of the EIA Directive. This will be assessed at sub-project allocation under the programme loan. In addition, the Programme Loan project will contribute to the reduction of CO2 emissions as the electricity used through the EV infrastructure will power electric vehicles. The emission savings result from the replacement of conventional cars operating on fossil fuels with electric cars powered by less carbon intensive electricity.

    Auftragsvergabe

    Promoters may be private and public companies (including companies in the utility sector). Thus the Promoters may be subject to EU rules on public procurement or concessions. If the EIB concludes that the Promoters are subject to EU public procurement legislation then the Bank will require the Promoters to ensure that contracts for the implementation of the sub-projects will be tendered in accordance with the relevant applicable EU procurement legislation Directives 2014/23/EU, 2014/24/EU or 2014/25/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Genehmigt - 15/05/2020

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Verkehr