Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20190495
    Veröffentlichungsdatum: 12 September 2019

    Projektträger – zwischengeschaltetes Finanzinstitut

    CITY OF OSTROW WIELKOPOLSKI

    Ort

    Beschreibung

    The project consists of a Framework Loan intermediated through Bank Gospodarstwa Krajowego, Poland's national development bank, financing eligible schemes implemented under the long-term capital investment programme of the City of Ostrów Wielkopolski, improving sustainable urban development and supporting climate mitigation measures.

    Ziele

    This operation is structured as a framework loan; the EIB will finance eligible schemes from the City's investment plan 2020-2023. Some schemes already identified include: (i) the development of a clean urban energy market (a pilot project aimed at distributing energy from renewable sources to the inhabitants of the municipality); (ii) construction of social housing; and (iii) construction of the new schools. The loan will be either a direct loan to the Promoter, or an intermediated loan through a local bank, including, but not limited to, BGK, the national promotional bank (to be confirmed during appraisal).

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    PLN 110 million (EUR 24 million)

    Gesamtkosten (voraussichtlicher Betrag)

    PLN 220 million (EUR 49 million)

    Umweltaspekte

    Promoter's environmental management capacity to properly apply the EU environmental directives (the EU SEA Directive 2001/42/EC, the EU Environmental Impact Assessment (EIA) Directive 2014/52/EU amending Directive 2011/92/EU, as well as the requirements of the EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC, where appropriate) will be assessed during appraisal. The schemes to be proposed under the Framework Loan should have an overall positive impact on the environment, by reducing energy consumption and by promoting sustainable urban development. Some of the schemes may, however, fall under Annex I or Annex II of the Directive 2014/52/EU amending the EIA Directive 2011/92/EU. This will be further assessed during project appraisal.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU/ 2014/25/EU where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Unterzeichnet - 23/07/2020

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Dienstleistungen