Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20190492
    Veröffentlichungsdatum: 28 Oktober 2019

    Projektträger – zwischengeschaltetes Finanzinstitut

    ENTE AUTONOMO VOLTURNO SRL

    Ort

    Beschreibung

    The project consists of the purchase of 40 new trainsets to be employed on the Circumvesuviana railways located in the Campania Region (Italy). The new trains will replace life-expired rolling stock.

    Ziele

    The project is expected to improve the quality of public transport services and facilitate modal shift from road to rail as well as reduce operational and maintenance costs. Moreover, the new energy efficient trains will reduce GHG emissions related to railway operations.

    Kommentar(e)

    n/a

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 68 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 222 million

    Umweltaspekte

    The project does not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU amended by the Directive 2014/52/EU, since manufacturing and use of rail rolling stock is not included in both lists. The project is expected to have a positive environmental impact through the replacement of existing rolling stock with more energy efficient trainsets and by supporting the railway to maintain and potentially increase its modal share of urban mobility in the metropolitan area of Naples. The EIB will assess such possible impacts as well as the arrangements for the scrapping of dismissed rolling stock during appraisal.

    Auftragsvergabe

    The Promoter will be required to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 19/12/2019

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Verkehr