Veröffentlichungsdatum: 10 September 2020
Projektträger – zwischengeschaltetes Finanzinstitut
METSAE BOARD OYJOrt
Beschreibung
Replacement of recovery boiler, turbine generator and the installation of a black liquour superconcentrator at the Husum pulp mill in Sweden.
Ziele
The replacement of the currently existing recovery boilers and associated steam and power generation by a new, more efficient system will peruse economies of scale and overall system modernisation to increase the electricity generation, while still meeting the overall heat demand of the existing integrated pulp and paper mill with similar thermal input. The project does not target an increase in mill's production capacity.
Sektor(en)
- Industrie - Verarbeitendes Gewerbe/Herstellung von Waren
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 125 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 300 million
Umweltaspekte
The project's compliance with all applicable national and EU environmental legislation will be verified during the appraisal. An environmental impact assessment will be carried out and mitigating and/or compensation measures applied as necessary.
Auftragsvergabe
The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the relevant applicable EU procurement rules.
Projektstatus
Unterzeichnet - 6/04/2020
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).