Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20190486
    Veröffentlichungsdatum: 11 Mai 2020

    Projektträger – zwischengeschaltetes Finanzinstitut

    CITY OF STOCKHOLM

    Ort

    Beschreibung

    The project will finance the reconstruction of the Slussen area, named after the locks between Lake Mälaren and the Baltic Sea, the renewal of the locks and the road bridges on top of the lock as well as the construction of a new bus terminal, an intermodal transport hub, bus lanes, bicycle and pedestrian paths.

    Ziele

    The aim of the project is to ensure the safety and continued availability of key urban road and public transport infrastructure, and to improve public transport offer within Stockholm. Rebuilding the lock will allow the water management authorities to increase the amount of water discharged from Lake Mälaren into the sea and thus reduce the risk of flooding that is currently threatening the area around the lake.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    SEK 4000 million (EUR 386 million)

    Gesamtkosten (voraussichtlicher Betrag)

    SEK 12948 million (EUR 1251 million)

    Umweltaspekte

    The project falls under annex II of the Directive 2014/52/EU amending the Environmental Impact Assessemnt (EIA) Directive 2011/92/EU and the competent authority has screened it in, after which the promoter completed an EIA. During the appraisal it will be assessed what components of the project the EIA covers and the project compliance with the above mentioned EIA directive, as well as compliance with the SEA Directive 2001/42/EC and the Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively) and the Water Framework Directive (2000/60/EC).

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation: Directives 2014/24/EU and 2014/25/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 7/10/2020

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Schweden Verkehr