Suche starten De menü ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20190312
    Veröffentlichungsdatum: 4 Dezember 2019

    Projektträger – zwischengeschaltetes Finanzinstitut

    SPECIAL PURPOSE ENTITY(IES)/FUND

    Ort

    Beschreibung

    The project will finance the design and construction of a power plant that will produce renewable electro-methanol (e-methanol) from wind energy and waste CO2. The plant will be located in Stenungssund, Southwest Sweden, and have the capacity to produce 50 kt/y of e-methanol.

    Ziele

    The project will contribute to the decarbonisation of the transport sector. Electro-methanol, synthetic methanol and bio- methanol are alternative energy carriers frequently considered as key elements for the energy transition to complement electrification, cross-sectoral integration and power-to-fuel deployment.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 50 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 100 million

    Umweltaspekte

    The project falls under Annex I of Directive 2011/92/EU (as amended by Directive 2014/52/EU) and therefore is subject to a mandatory Environmental Impact Assessement (EIA), including public consultation. In addition, depending on the size of temporary on-site storage of methanol and potentially hydrogen, the project may be considered lower-tier or upper-tier establishment under the SEVESO directive.

    Auftragsvergabe

    The Promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if after the project appraisal, the EIB were to conclude that the Promoter is after all subject to EU public procurement legislation Directive 2014/23/EU / 2014/24/EU or 2014/25/EU, then the Bank would require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation Directive 2014/23/EU / 2014/24/EU / 2014/25/EU, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required

    Projektstatus

    In Prüfung - 25/09/2019

    Haftungsausschluss

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Tags

    Schweden Energie