Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20180691
Veröffentlichungsdatum: 22 Juni 2022

Projektträger – zwischengeschaltetes Finanzinstitut

EDF RENOUVELABLES SA,ENBRIDGE INC

Ort

Beschreibung

Design, construction, financing and operation of a 24MW floating offshore windfarm located off the coast of Faraman (Provence-Alpes-Côte d'Azur, France).

Ziele

The development of offshore wind energy will support EU and national targets for renewable energy generation and greenhouse gas emission reduction, it thus contributes to environmental objectives. The project will contribute to the Bank's priority objectives for energy sector lending related to renewable energy sources and transversal objectives of climate action. Floating turbines could allow projects to access project sites with better wind resources (for which the fixed-foundation solution would likely be too costly) and generate potential savings with regards to foundations and installation costs. The project is thus likely to contribute to the advance of EU technological leadership in wind energy and therefore support long-term EU economic growth.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 50 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 287 million

Umweltaspekte

Following an environmental impact assessment (EIA) process, the project received environmental authorisation in February 2019. The project is located within a Natura 2000 area; an appropriate assessment (AA) concluded that the project is not expected to have a significant negative impact on the integrity of the concerned nature conservation sites.

Auftragsvergabe

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU), with the publication of tender notices in the Official Journal of the EU, as and where appropriate.

Projektstatus

Unterzeichnet - 16/11/2021

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Frankreich Energie