Veröffentlichungsdatum: 29 April 2019
Projektträger – zwischengeschaltetes Finanzinstitut
ZWECKVERBAND NAHVERKEHR WESTFALEN-LIPPE,ZWECKVERBAND VERKEHRSVERBUND RHEIN-RUHROrt
Beschreibung
The project consists of the purchase of 60 new passenger trains including operational reserve and associated equipment for the replacement of existing diesel traction rolling stock, for a public service contract to operate rail passenger services in North Rhine-Westphalia, Germany. These trains will use an electric drivetrain, powered by an alternative power source.
Ziele
This project will enable the acquisition of emission-free rolling stock with innovative power units (fuel cell or battery electric) in the Niederrhein and Münsterland area (including inter alia the cities Düsseldorf, Duisburg, Essen and Dortmund) as a replacement for the current diesel powered units.
Sektor(en)
- Verkehr - Verkehr und Lagerei
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 192 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 400 million
Umweltaspekte
The investment proposed under the project does not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as manufacturing of rail rolling stock is not included in either list. The need of EIA and/or assessment according to the Habitants Directive for associated facilities (e.g. maintenance workshops or depots) will be analysed during the appraisal. The project is expected to have a positive environmental impact by helping the railways to maintain modal share in key sections of the passenger market that are most appropriately met by rail.
Auftragsvergabe
The Bank will require the Promoter to ensure that the contract for the implementation of the project has been or and will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union (OJEU), as and where required. The public service obligation tender was published in the OJEU (2018/S 090-203557, 12/05/2018).
Projektstatus
Unterzeichnet - 11/12/2019